Driven or set to the soil
Foundation chosen in design from the site's geotechnical data.
Fixed-tilt tables laid out to the land, rather than the land to the layout.
Real sites slope, dip and change soil halfway down a row. Ground starts from the survey and sets each table to the grade and ground it stands on.
Change the grade and the tilt. The table stays where it should be; the posts take up the difference.
Illustrative. Not engineering output.
Foundation chosen in design from the site's geotechnical data.
Rows step with the land instead of the land being cut flat.
Designed as a single kit, labeled in install order.
Foundation
Rows set to the landOpen land at real grades. Each table is set to its site's slope and soil, and the foundation type is chosen in design from survey and geotechnical data.
That is the intent. Rows are designed to step with the grade, so the land needs less reshaping before install.
Kitted to the layout and labeled in install order, so crews unpack in the sequence they build.
Send the site and the size. We start with the ground.