Foundation
It starts below the ground line. The foundation type comes from the site's soil data, then it is driven or set to depth.
Post
The post carries everything above it down to the foundation. Its length follows the grade, so the table stays true.
Clamp
The clamp joins post to rail. It is where load changes direction, so it is sized for the worst case it will see.
Rail
The rail spans the table and sets the tilt. One profile across the whole table keeps the kit short.
Panel
The panel goes on last, and takes the weather first: wind lifts it, snow sits on it.
The load path
Now follow it back down: panel to rail, rail to clamp, clamp to post, post to ground. Every A is a load path.
